DPAS SCR: 00932



  • SCR Number
    00932
  • Title
    Provide Mass Update Capability to Maintenance Schedule
  • DPAS Module
    MU
  • Reporting Organization
    Leidos
  • State
    New
  • Description

    Description
    Currently DPAS provides for PM Scheduling one asset at a time. With several of the DPAS customers receiving 50+ vehicles at a time, it is very time consuming to set up PM schedules. With like assets receiving the same PM schedule, there is also quite a bit of effort to validate that all of the PM schedules are entered.

    Recommend
    Provide for the establishing of PM schedules and update of the PM schedules en masse. Possibly use Equipment Group or Vehicle Group to select assets to apply the schedule to.

    Mission Critical
    Yes - Many of the customers have stated they do not have the resources to individually set up PM Schedules and to validate that the schedules have been established correctly.

    Benefits
    Reduces the amount of time to profile some assets 100 to 1 and improves accuracy.

    Users
    This affects all DPAS users of M&U PM Scheduling. This SCR was requested by the attendees of the DPAS M&U Workshop held on November 13-15, 2015 and was given a priority of "4" out of 40.

    03/22/2017 – per Randy and Jim's email, replacing SCR 01121 with this SCR.