DPAS SCR: 01380
- SCR Number
01380
- Title
NMC Status Date Field
- DPAS Module
MU
- Reporting Organization
AF: VSCOS
- State
Done
- History
Submitted: 17 Sept 2018
- Description
Description
Currently when updating from NMCM to NMCS or NMCS to NMCM the basic tab of Work Order defaults to the server time stamp to record the status change. VSCOS currently has a need at times to back date this status change rather than real time server stamping.Recommended
To give ability to back date the status change date field will need to be added to the NMC Basic tab. "NMC Status Date", the field will be editable defaulting to server date time stamp, with validations against the NMC Tab of Work Order to ensure no status date conflicts exist and validate against NMC Begin date field and NMC End date field on Basic tab.Mission Critical
Mandated to capture the time an asset actually was out of service not when the work-order was open.Benefits
Gives users to update Work Orders that may have not have been updated in DPAS in "Real Time" as statuses changed.Users
YesCompleted – Release 6.3 – 21 December 2018