DPAS SCR: 00816



  • SCR Number
    00816
  • Title
    Required Delivery Date not reflected on M&U Work Order
  • DPAS Module
    Warehouse
  • Reporting Organization
    USMC: DMC
  • State
    Removed
  • History
    Submitted: 4/9/2015
  • Description
    The Required Delivery Date (RDD) from a MRO is not reflected on the M&U Work Order.  This is very important information when dealing with a shipment (MRO).
     
    Recommended solution: The Required Delivery Date (RDD) that a MRO is assigned in the WM Module has to carry over to the M&U Work Order.  As it is currently, the RDD shown in M&U is based off of the priority code assigned by the system and can be changed by any M&U User.  MROs are the top priority in Maintenance and their urgency is driven by the RDD on the MRO.

    The Required Delivery Date (RDD) assigned in the WM Module has to be reflected on the M&U Work Order.

     

    Currently DMC needs a way to manage priority of WO opened from the Warehouse MRO process.  SCR is to have the RDD populate into the WO process and appear on the physical PDF of Work Order.  The need to prioritize WO coming from the Warehouse MRO process is a need across DOD.  In addition to RDD a better system method to manage this business process would be to have the MRO priority FAD relate directly to a WO Priority (Fred Maley).  Spoke with Rick M. 1 Dec 2016 of need of SCR.  Will work with development to have effort assigned. 

    11 Mar 2021 – cancelled per Jack Sanders
    No Longer Needed.