DPAS SCR: 00908
- SCR Number
00908
- Title
Implement Project Codes into ICP
- DPAS Module
Warehouse
- Reporting Organization
USMC: DMC
- State
Removed
- History
Submitted: 9/1/2015
- Description
There is no project type that supports the DMC Inventory Control Point (ICP) project. ICP projects assign Project Codes to specific pieces of inventory which are sent by and received for the ICP. Each project has a List of Requirements (LOR) which defines the Stock Nbrs or Part Nbrs which are acceptable to be received against the specified Project Code. All the items listed on a specific LOR are correlated in that they are all components of the same primary end item (PEI).Recommended solution: Create an ICP project type which will allow for the upload of the LOR, the assignment of a Project Code, as well as a way to record the PEI for which the items on the LOR are components for. Allow for the ability to record a POC for the project. Modify the receiving process to allow for the selection of an open ICP project and to also validate the Stock Nbr (or Part Number) as being valid against the LOR. Receiving should prevent the receipt of a Stock Nbr which is not listed on the LOR.
11 Mar 2021 – cancelled per Jack Sanders
No Longer Needed.