DPAS SCR: 01195
- SCR Number
01195
- Title
default completion time
- DPAS Module
Warehouse
- Reporting Organization
AF: AFERMS
- State
New
- History
Submitted: 30 Aug 2017
- Description
Description
there is a function to track time to compete inspections. we need default times assigned to NSNs. If time is greater than the default a justification narrative needs to be input.Recommended
add field at the NSN level to input default inspection time. when an inspection is performed that has a default time, mandate a start time and auto-populate a stop time. allow adjustment of the stop time. if the stop time exceeds the default inspection time, require a justification narrative be input.Mission Critical
mandated. tracking time to perform inspections allows AFE to justify manpower positionsBenefits
manpower justifiedUsers
all AFERMS users