DPAS SCR: 01195



  • SCR Number
    01195
  • Title
    default completion time
  • DPAS Module
    Warehouse
  • Reporting Organization
    AF: AFERMS
  • State
    New
  • History
    Submitted: 30 Aug 2017
  • Description

    Description
    there is a function to track time to compete inspections.  we need default times assigned to NSNs. If time is greater than the default a justification narrative needs to be input.

    Recommended
    add field at the NSN level to input default inspection time. when an inspection is performed that has a default time, mandate a start time and auto-populate a stop time.  allow adjustment of the stop time.  if the stop time exceeds the default inspection time, require a justification narrative be input.

    Mission Critical
    mandated.  tracking time to perform inspections allows AFE to justify manpower positions

    Benefits
    manpower justified

    Users
    all AFERMS users